VDC AIMS TO TAKE ADVANTAGE OF BIM INFORMATION MODELS AS A DATA SOURCE TO OPTIMIZE DESIGN AND CONSTRUCTION PROCESSES
The methodology goal could be described simply as to build twice – first virtual, then real: to solve problems in offices so they will never go to the construction site.
The method requires a dedicated team of BIM coordinators, VDC specialists, and Field supervisors directly on the construction site, and with back-support of the engineering office.