CDE

COMMON DATA ENVIROMENT (CDE)

Common Data Environment (CDE) is the single source of information for BIM projects we use to collect, manage and distribute documentation, graphical models and non-graphical data for the whole project team. Enabling ease of use and re-use of the information among parties leading to a lean BIM project delivery process.

VALUE
Integration of team members for significantly better outcomes
Synchronized and well-coordinated information workflows
Abilities for team to stay connected working in different locations

TOOLS
BIM360 Design, BIM360 Docs, Dalux Box

BIM DESIGN

BIM DESIGN

BIM design is an authoring process of BIM multi-discipline models creation (Architecture, Structure, HVAC, Plumbing, Lighting, Fire Protection, Electrical, etc.) in form of complete information-rich digital representation of what is to be built. BIM models are evolving and accumulative single source of data accessible for decision making at any project stage

VALUE
Improved accuracy and consistency of design
Rapid execution of design changes
High quality of drawings, BOQ generated out of BIM models

TOOLS
Autodesk Revit, Tekla

BIM MODDELING

BIM MODELING

BIM Modeling stays for creation of BIM models based on existing information from 2D drawings, as-built drawings or laser scanning data in order to enable possibilities of use BIM in 3D coordination (e.g. existing conditions with new installations), increase visual understanding of existing designs and installations, using BIM for operation and asset management

VALUE
Integration of BIM potential into existing assets
3D coordination for new designs fit-out
BIM models as foundation of asset management systems

TOOLS
Autodesk Revit, Tekla, Autodesk Civil 3D, 3D Laser Scanning

ENGINEERING ANALYSIS

ENGINEERING ANALYSIS

Engineering Analysis process utilizes a BIM model as information source for engineering calculations (e.g. to determine the behavior of structural system, make energy assessment, or find most effective engineering solution).

VALUE
Integrated calculations using BIM model
Automated complex and time-consuming design tasks and routine work
Alternatives rapid evaluation for optimum engineering solutions

TOOLS
Autodesk Insight, MagiCAD

3D COORDINATION

3D COORDINATION

3D Coordination process is to ensure that BIM models geometry is fit for sharing, workable and consistent with all hard clashes removed, installation clearance issues and other design collisions solved. The aim is to avoid field conflicts and costly coordination issues during construction.

VALUE
Coordination of multiple designs and trades
Goal of «zero clashes» in issued designs
Considerably reduced number field conflicts

TOOLS
Autodesk Navisworks, BIM360 Coordinate

VR MODELS REVIEWS

VR MODELS REVIEWS

Use of VR visualization capabilities of BIM models for clearer, unambiguous perception of design characteristics by the client, end-user, contractor, consultant or operator in a virtual environment, to make appropriate adjustments prior to commencement of construction work or procurement of materials.

VALUE
Easier for stakeholders to visualize designs
Experience transfer from end-user to designer possibility
High level of design awareness and understanding among the team members

TOOLS
BIM360 Docs, BIM 360 Design, VR

DESIGN VALIDATION

DESIGN VALIDATION

Utilizing BIM models during design phase for verification, approval of design, control of design progress, compliance check, etc. Ensuring collaborative work of client, designer, builder and facility operator to generate best solutions

VALUE
Early involving possibilities for stakeholders for decision making
Better solutions are discovered due to better design understanding
Avoided errors that may not otherwise be discovered

TOOLS
BIM360 Docs, BIM 360 Design, VR

BOQ GENERATION

DRAWINGS, BOQ GENERATION

BIM Models as single source to generate set of drawings and bill of quantities. Integrated and interlinked data makes possible to produce highly accurate documentation required to make comprehensive estimates and ultimately construct the project

VALUE
Efficient delivery of drawings and BoQ from validated BIM models
Reduction of time for drawing production, rapid changes implementation
Accurate information for procurement and allocation of resources

TOOLS
Autodesk Revit

4d virtual construction

4D VIRTUAL CONSTRUCTION

4D Virtual Construction planning is a process of linking BIM-model with construction schedule, following with construction progress tracking using 4D environment. Visualization of the sequence and methodology of construction according to the schedule for the purpose of find and fix spatiotemporal clashes

VALUE
Optimization construction schedule
Visualize progress with reports for better evaluation: plan progress vs. fact progress, virtual physical values vs. fact physical values
Real-time construction progress tracking

TOOLS
Synchro 4D, Synchro Site, Fuzor

VISUALIZATION AND COMMUNICATION

VISUALIZATION AND COMMUNICATION

Visualization And Communication is a process of using BIM model possibilities for increasing visual understanding of design and enhance communication by making data easy accessible and maintainable

VALUE
Greater visualization and clarity of what is to be built for construction workers
Accessibility to the most updated approved models, drawings, and documents to site personnel
Using QR codes on drawings and on site areas to ease access and version control

TOOLS
BIM 360 Design, BIM360 Docs

QUALITY CONTROL

QUALITY CONTROL

Quality Control is a process of using BIM model and CDE to systematize the workflows of identifying, tracking and solving the quality issues during construction process. It is realized based on mobile access to CDE functionality with specifically adjusted information workflows

VALUE
Easy access and tracking of issues status
Reduced time in issue reporting and response latency

TOOLS
BIM 360 Built, BIM360 Docs

site safety planning

SITE SAFETY PLANNING

Site Safety Planning is about utilizing BIM model identify possible safety risks in each key phase of construction, to visualize construction safety or risk hazards and simulate safety measures, especially as integrated with construction works

VALUE
Planning ahead, ability to clearly visualize possible issues and to prepare preventive measures
Simulation and visualization of safety risks for team briefings

TOOLS
Autodesk Revit, Synchro 4D, MS PowerPoint

ASSET INFORMATION MODELING

AS-BUILT BIM MODELING

As-Built BIM Modeling is a process of aligning the geometry and model information with as-constructed state of asset. Is realized by field verification through modelling based on 3D laser scan point cloud data, and/or existing markup drawings and as-built documentation

VALUE
Reliable source of information for further use in operations
Greater accessibility and possibilities for further use compared to standard as-built set of paper drawings

TOOLS
Autodesk Revit, Tekla, 3D Laser scanning

asset information

ASSET INFORMATION MODELING

Asset Information Modeling is a process of BIM model developing during project execution stage by adding and linking all data required to support operation and asset management functions

VALUE
AIM Model as single source of current, actionable information;
Ability to integrate the model data with Facility and Asset management software, exploring all the benefits if digitalized data at your fingertips

TOOLS
Revit, Navisworks, BIM360 Design

OPERATION, ASSET AND SPACE MANAGEMENT

OPERATION, ASSET AND SPACE MANAGEMENT

Operation, Asset and Space Management functions to benefit from using technology platforms grounded on reliable data from AIM (BIM) model

VALUE
Use BIM data to ensure the most efficient maintenance, scheduling, use of space, asset management

TOOLS
ARCHIBUS Applications, Dalux FM