Selected work
Projects where coordination becomes practical
Real design and engineering scope, visible through systems, models, documentation, and resolved interfaces across complex buildings and infrastructure
- 24 selected projects
- 6 sectors
- Europe delivery context

Brownfield Industrial Extension: 20,000 m² Inside an Operating Facility
How TEBIN coordinated a 20,000 m² extension within a 245,000 m² European production facility using 8 BIM models, 800+ drawings, and one digital workflow.
- 20,000 m²Extension area
- 8Coordinated discipline models
- 800+Design drawings

Berlin Residential Heating Case: TEBIN's BIM and LINEAR Workflow
How TEBIN designed two Berlin residential buildings with 4,200 m² of conditioned space and 24,000 m of piping in a BIM and LINEAR workflow.
- 4,200+ m²Conditioned floor area
- 24,000 mEmbedded heating pipework
- 2Multifamily buildings

7,000 m² Industrial Plant in Central Europe: Full-Scope BIM Delivery
A 7,000 m² production facility delivered across architecture, structural, civil, MEP, and fire protection in one coordinated BIM model.
- 7,000 m²Production facility
- 6Coordinated disciplines
- 1Federated delivery environment

Fuel Backup System Design: From Technical Input to Buildable Documentation
How TEBIN transformed fuel-system technical inputs into coordinated BIM models, schematics, supports, trench drawings, and construction documentation.
- 1:1Equipment geometry scale
- LODSet for construction review
- BIMCoordinated system package

TEBIN Standard 10,000 m² Dry Warehouse: BIM-Based Reference Design for Engineering Partners
TEBIN's BIM-based standard design for a 10,000 m² dry warehouse that engineering companies can reuse as a coordinated digital foundation.
- 10,000 m²Reference warehouse
- 12 × 24 mStructural grid
- 12 mStorage height basis

Replacing the UPS Systems of a Data Centre That Could Not Be Switched Off
Design for replacing the uninterruptible power supply systems and battery banks of a data centre in continuous operation: replacement strategy, removal sequencing, and updated electrical calculations, protection settings, and as-built documentation.
- LP1–LP4HOAI design stages
- LiveFacility in operation throughout
- As-builtDocumentation reconciled

The Substation Behind the Data Centres: Over 200 MW at 150/20/10 kV
Civil and electrical basic design for a grid substation of over 200 MW at 150/20/10 kV, serving a data centre cluster in the Netherlands: the power infrastructure that sits upstream of the halls.
- 200+ MWSubstation capacity
- 150/20/10 kVVoltage levels
- 2Disciplines: civil and electrical

From Printing Works to Data Centre: Electrical, BMS, and Fire Safety Design for a Conversion
Concept and basic design of electrical, building management, and fire safety systems for the conversion of an existing printing facility into a data centre of under 10 MW, with approximately 9,000 m² of white space.
- Under 10 MWIT power
- ~9,000 m²White space
- ConversionExisting building reused

Testing a Data Centre That Is Already Full: Permanent Load Bank Design
A permanent load bank strategy for a data centre in full operation: testing concept, integration across redundant electrical paths, load bank locations, busbar routing, and updated single-line diagrams.
- LP1–LP4HOAI design stages
- LiveFacility in operation
- PermanentTesting capability built in

Detailed Design Across an EV Manufacturing Campus of Over 250,000 m²
Detailed design and as-built documentation across the production buildings of an EV manufacturing campus in Germany: cell production, laboratories, stamping, and general assembly, with a combined footprint over 250,000 m².
- 250,000+ m²Combined building footprint
- 4+Production building types
- 5DBIM standards developed

Building Services for a Biosafety Level 3 Laboratory: 16,800 m² Under Containment Rules
MEP design for a six-storey, 16,800 m² laboratory building classified Biosafety Level 3: HVAC, water, sewerage, sprinklers, laboratory gases, electrical, fire detection, and security, designed to biosafety requirements.
- BSL-3Biosafety containment level
- 16,800 m²Laboratory building area
- 60 / 40Laboratory to office ratio

Emergency Power Fuel Infrastructure for a Data Centre: 16-Tank Storage and Distribution Design
Design of fuel storage and distribution for a data centre emergency power system: 16 diesel tanks, 8 pump rooms, 4 filling cabinets, and documentation to As-Built.
- 16Diesel fuel tanks
- 8Pump rooms
- 4Filling cabinets

Fuel and Urea Systems for a Multi-Level Data Centre: LOD 450 Detailed Design
LOD 450 design of fuel and urea systems for a data centre with vertically stacked generators: 3 × 100 m³ fuel tanks, 4 × 10 m³ DEF tanks, and combined pump rooms.
- 3 × 100 m³Fuel storage tanks
- 4 × 10 m³Urea (DEF) tanks
- LOD 450Detailed design standard

Data Centre Expansion Zone: Underground Fuel Storage and Cross-Zone Urea Tie-In
LOD 450 design for a data centre expansion zone: 5 × 100 m³ underground fuel tanks, 3 × 10 m³ indoor DEF tanks, and a cross-zone urea tie-in serving 4 generators.
- 5 × 100 m³Underground fuel tanks
- 3 × 10 m³Indoor urea (DEF) tanks
- 4Generators served via tie-in

Urea (DEF) Distribution for a Data Centre: One Storage Tank, 22 Generator Sets
Execution design of a urea (DEF) system for a data centre: a 50 m³ storage tank with tanker offload and a modular pump skid distributing to 22 generator sets.
- 50 m³Urea storage tank
- 22Generator sets supplied
- 2Independent filling points

Modular Aviation Fuelling Station: Full Design from Concept to As-Built
Full design of a modular aviation fuelling station in Germany: station concept, container fit-out, and the fuel path from storage tank to aircraft — LPH 1 to 5.
- LPH 1–5HOAI design stages delivered
- 1Modular container station
- As-BuiltFinal documentation stage

Food Retail Distribution and Production Hub: Integrated Design for a 200,000 m² Complex
Integrated design and engineering for a 200,000 m² food retail hub combining ambient warehouses, chilled and frozen storage, and production areas.
- 200,000 m²Total complex scale
- 40,000 m²Chilled and frozen storage
- 16,000 m²Production area

Construction Equipment Rental Service Centre: Design for Maintenance, Washing, Repair, and Fleet Operations
Full multidisciplinary design for an equipment rental service centre with wash bay, repair workshops, paint booth, spare-parts storage, and site utilities.
- ~7,000 m²Main facility scale
- 3Office levels
- Full designConcept to working documentation

Dry Building Mixes Production Plant: Full Basic Design for an Industrial Facility
Full Basic Design for a dry building mixes production plant with a 50.4 m silo body, 17,284.5 m² listed building area, and a process-driven industrial design logic.
- 50.4 mSilo body height
- 17,284.5 m²Listed building area
- 6.31 haDesign boundary site

Reconstruction of a Logistics Warehouse Complex: Full Project Design
Full Project Design for reconstructing a damaged operating warehouse complex with 46 loading docks, more than 54,000 m² of area, and a civil protection shelter.
- 54,000+ m²Area after reconstruction
- 46Loading docks
- 300Civil protection shelter capacity

Hotel and Office Centre: Vertical Mixed-Use Design
Architectural design correction for a hotel and office centre on a compact 0.31 ha urban site, coordinating hotel, office, parking, technical, and fire-safety logic.
- 0.31 haCompact urban site
- 47,000+ m²Overall building area
- 546Apartment-type hotel rooms

85,000 m² Commercial Complex: Integrated Multidisciplinary Design
Integrated design and engineering for a six-building commercial complex, connecting BIM coordination, value engineering, quantities, and authority documentation.
- 85,000 m²Gross building area
- 6Office buildings
- 0.85GLA to GBL target ratio

UNIT.City BIM and VDC Programme: From Design Models to Construction Use
A multi-project BIM and Virtual Design and Construction programme connecting coordinated models, common data environment workflows, and construction planning.
- 100,000+ m²Programme area
- 40+Coordinated BIM models
- 65Client and contractor staff trained

Mining Facility BIM Coordination Across 44 Buildings
BIM reconstruction and coordination for a mining facility programme covering 44 buildings, 29 hectares of laser-scanned site, and about 700 source drawings.
- 44Buildings reviewed
- 29 haLaser-scanned site area
- 3,000Coordination issues identified