Brownfield Industrial Extension: 20,000 m² Inside an Operating Facility
How TEBIN coordinated a 20,000 m² extension within a 245,000 m² European production facility using 8 BIM models, 800+ drawings, and one digital workflow.
Selected work
Real design and engineering scope, visible through systems, models, documentation, and resolved interfaces across complex buildings and infrastructure

How TEBIN coordinated a 20,000 m² extension within a 245,000 m² European production facility using 8 BIM models, 800+ drawings, and one digital workflow.

How TEBIN designed two Berlin residential buildings with 4,200 m² of conditioned space and 24,000 m of piping using an integrated BIM and LINEAR calculation workflow.

A 7,000 m² production facility delivered across architecture, structural, civil, MEP, and fire protection in one coordinated BIM model.

How TEBIN transformed fuel-system technical inputs into coordinated BIM models, schematics, supports, trench drawings, protection systems, and construction documentation.

TEBIN has developed a BIM-based standard design for a 10,000 m² dry warehouse that engineering and design companies can reuse as a coordinated digital foundation for their own logistics projects.

Design of fuel storage and distribution for a data centre emergency power system: 16 diesel tanks, 8 pump rooms, 4 filling cabinets, cathodic protection, prefabrication engineering, and full documentation to As-Built.

LOD 450 detailed design of fuel and urea systems for a data centre with vertically stacked generators: 3 × 100 m³ fuel tanks, 4 × 10 m³ DEF tanks, combined pump rooms, and provision for a future adjacent zone.

LOD 450 design for a data centre expansion zone: 5 × 100 m³ underground fuel tanks, 3 × 10 m³ indoor DEF tanks, a cross-zone urea tie-in serving 4 generators, and fabrication-ready valve box drawings.

Execution design of a urea (DEF) system for a data centre: a 50 m³ storage tank with tanker offload, a modular pump skid distributing to 22 generator sets, and an independent backup filling line.

Full design delivery of a modular aviation fuelling station in Germany: station concept, container fit-out, bottom loader integration, and the fuel path from storage tank to aircraft — LPH 1 through 5.

Integrated design and engineering for a 200,000 m² food retail hub combining ambient warehouses, chilled and frozen storage, production areas, fleet service, staff support, and site logistics.

Full multidisciplinary design for an equipment rental service centre with wash bay, repair workshops, paint booth, spare-parts storage, offices, staff facilities, fire-water systems, and site utilities.

Full Basic Design for a dry building mixes production plant with a 50.4 m silo body, 17,284.5 m² listed building area, and a process-driven industrial design logic.

Full Project Design for reconstructing a damaged operating warehouse complex with 46 loading docks, more than 54,000 m² of area, fire compartments, logistics flows, and a civil protection shelter.

Architectural design correction for a hotel and office centre on a compact 0.31 ha urban site, coordinating hotel, office, parking, technical, and fire-safety logic.

Integrated design and engineering for a six-building commercial complex, connecting BIM coordination, value engineering, quantities, and authority documentation.

A multi-project BIM and Virtual Design and Construction programme connecting coordinated models, common data environment workflows, construction planning, and client-team capability.

BIM reconstruction and coordination for a mining facility programme covering 44 buildings, 29 hectares of laser-scanned site context, and approximately 700 source drawings.