Selected work

Projects where coordination becomes practical

Real design and engineering scope, visible through systems, models, documentation, and resolved interfaces across complex buildings and infrastructure

18 selected projects6 sectorsEurope delivery context
Brownfield Industrial Extension: 20,000 m² Inside an Operating Facility — project by TEBIN
Industrial & ManufacturingEurope

Brownfield Industrial Extension: 20,000 m² Inside an Operating Facility

How TEBIN coordinated a 20,000 m² extension within a 245,000 m² European production facility using 8 BIM models, 800+ drawings, and one digital workflow.

20,000 m²Extension area8Coordinated discipline models800+Design drawings
View project
Berlin Residential Heating Case: TEBIN's BIM and LINEAR Workflow — project by TEBIN
ResidentialBerlin, Germany

Berlin Residential Heating Case: TEBIN's BIM and LINEAR Workflow

How TEBIN designed two Berlin residential buildings with 4,200 m² of conditioned space and 24,000 m of piping in a BIM and LINEAR workflow.

4,200+ m²Conditioned floor area24,000 mEmbedded heating pipework2Multifamily buildings
View project
7,000 m² Industrial Plant in Central Europe: Full-Scope BIM Delivery — project by TEBIN
Industrial & ManufacturingCentral Europe

7,000 m² Industrial Plant in Central Europe: Full-Scope BIM Delivery

A 7,000 m² production facility delivered across architecture, structural, civil, MEP, and fire protection in one coordinated BIM model.

7,000 m²Production facility6Coordinated disciplines1Federated delivery environment
View project
Fuel Backup System Design: From Technical Input to Buildable Documentation — project by TEBIN
Mission-Critical InfrastructureEurope

Fuel Backup System Design: From Technical Input to Buildable Documentation

How TEBIN transformed fuel-system technical inputs into coordinated BIM models, schematics, supports, trench drawings, and construction documentation.

1:1Equipment geometry scaleLODSet for construction reviewBIMCoordinated system package
View project
TEBIN Standard 10,000 m² Dry Warehouse: BIM-Based Reference Design for Engineering Partners — project by TEBIN
Logistics & DistributionEuropean reference design

TEBIN Standard 10,000 m² Dry Warehouse: BIM-Based Reference Design for Engineering Partners

TEBIN's BIM-based standard design for a 10,000 m² dry warehouse that engineering companies can reuse as a coordinated digital foundation.

10,000 m²Reference warehouse12 × 24 mStructural grid12 mStorage height basis
View project
Emergency Power Fuel Infrastructure for a Data Centre: 16-Tank Storage and Distribution Design — project by TEBIN
Mission-Critical InfrastructureThe Netherlands

Emergency Power Fuel Infrastructure for a Data Centre: 16-Tank Storage and Distribution Design

Design of fuel storage and distribution for a data centre emergency power system: 16 diesel tanks, 8 pump rooms, 4 filling cabinets, and documentation to As-Built.

16Diesel fuel tanks8Pump rooms4Filling cabinets
View project
Fuel and Urea Systems for a Multi-Level Data Centre: LOD 450 Detailed Design — project by TEBIN
Mission-Critical InfrastructureGermany

Fuel and Urea Systems for a Multi-Level Data Centre: LOD 450 Detailed Design

LOD 450 design of fuel and urea systems for a data centre with vertically stacked generators: 3 × 100 m³ fuel tanks, 4 × 10 m³ DEF tanks, and combined pump rooms.

3 × 100 m³Fuel storage tanks4 × 10 m³Urea (DEF) tanksLOD 450Detailed design standard
View project
Data Centre Expansion Zone: Underground Fuel Storage and Cross-Zone Urea Tie-In — project by TEBIN
Mission-Critical InfrastructureGermany

Data Centre Expansion Zone: Underground Fuel Storage and Cross-Zone Urea Tie-In

LOD 450 design for a data centre expansion zone: 5 × 100 m³ underground fuel tanks, 3 × 10 m³ indoor DEF tanks, and a cross-zone urea tie-in serving 4 generators.

5 × 100 m³Underground fuel tanks3 × 10 m³Indoor urea (DEF) tanks4Generators served via tie-in
View project
Urea (DEF) Distribution for a Data Centre: One Storage Tank, 22 Generator Sets — project by TEBIN
Mission-Critical InfrastructureGermany

Urea (DEF) Distribution for a Data Centre: One Storage Tank, 22 Generator Sets

Execution design of a urea (DEF) system for a data centre: a 50 m³ storage tank with tanker offload and a modular pump skid distributing to 22 generator sets.

50 m³Urea storage tank22Generator sets supplied2Independent filling points
View project
Modular Aviation Fuelling Station: Full Design from Concept to As-Built — project by TEBIN
Aviation Fuel InfrastructureGermany

Modular Aviation Fuelling Station: Full Design from Concept to As-Built

Full design of a modular aviation fuelling station in Germany: station concept, container fit-out, and the fuel path from storage tank to aircraft — LPH 1 to 5.

LPH 1–5HOAI design stages delivered1Modular container stationAs-BuiltFinal documentation stage
View project
Food Retail Distribution and Production Hub: Integrated Design for a 200,000 m² Complex — project by TEBIN
Logistics & Food RetailCentral Europe

Food Retail Distribution and Production Hub: Integrated Design for a 200,000 m² Complex

Integrated design and engineering for a 200,000 m² food retail hub combining ambient warehouses, chilled and frozen storage, and production areas.

200,000 m²Total complex scale40,000 m²Chilled and frozen storage16,000 m²Production area
View project
Construction Equipment Rental Service Centre: Design for Maintenance, Washing, Repair, and Fleet Operations — project by TEBIN
Industrial Service & Equipment RentalEastern Europe

Construction Equipment Rental Service Centre: Design for Maintenance, Washing, Repair, and Fleet Operations

Full multidisciplinary design for an equipment rental service centre with wash bay, repair workshops, paint booth, spare-parts storage, and site utilities.

~7,000 m²Main facility scale3Office levelsFull designConcept to working documentation
View project
Dry Building Mixes Production Plant: Full Basic Design for an Industrial Facility — project by TEBIN
Industrial & ManufacturingUkraine

Dry Building Mixes Production Plant: Full Basic Design for an Industrial Facility

Full Basic Design for a dry building mixes production plant with a 50.4 m silo body, 17,284.5 m² listed building area, and a process-driven industrial design logic.

50.4 mSilo body height17,284.5 m²Listed building area6.31 haDesign boundary site
View project
Reconstruction of a Logistics Warehouse Complex: Full Project Design — project by TEBIN
Logistics & DistributionUkraine

Reconstruction of a Logistics Warehouse Complex: Full Project Design

Full Project Design for reconstructing a damaged operating warehouse complex with 46 loading docks, more than 54,000 m² of area, and a civil protection shelter.

54,000+ m²Area after reconstruction46Loading docks300Civil protection shelter capacity
View project
Hotel and Office Centre: Vertical Mixed-Use Design — project by TEBIN
Hospitality & CommercialUkraine

Hotel and Office Centre: Vertical Mixed-Use Design

Architectural design correction for a hotel and office centre on a compact 0.31 ha urban site, coordinating hotel, office, parking, technical, and fire-safety logic.

0.31 haCompact urban site47,000+ m²Overall building area546Apartment-type hotel rooms
View project
85,000 m² Commercial Complex: Integrated Multidisciplinary Design — project by TEBIN
CommercialKyiv, Ukraine

85,000 m² Commercial Complex: Integrated Multidisciplinary Design

Integrated design and engineering for a six-building commercial complex, connecting BIM coordination, value engineering, quantities, and authority documentation.

85,000 m²Gross building area6Office buildings0.85GLA to GBL target ratio
View project
UNIT.City BIM and VDC Programme: From Design Models to Construction Use — project by TEBIN
Commercial & Mixed UseKyiv, Ukraine

UNIT.City BIM and VDC Programme: From Design Models to Construction Use

A multi-project BIM and Virtual Design and Construction programme connecting coordinated models, common data environment workflows, and construction planning.

100,000+ m²Programme area40+Coordinated BIM models65Client and contractor staff trained
View project
Mining Facility BIM Coordination Across 44 Buildings — project by TEBIN
Mining & Heavy IndustryPoltava, Ukraine

Mining Facility BIM Coordination Across 44 Buildings

BIM reconstruction and coordination for a mining facility programme covering 44 buildings, 29 hectares of laser-scanned site, and about 700 source drawings.

44Buildings reviewed29 haLaser-scanned site area3,000Coordination issues identified
View project

Let’s start your next
project together

Multidisciplinary Design and Engineering

Start a project →