OFFICE BUILDING AS A PART OF RESIDENTIAL COMPLEX

SCOPE & SOLUTIONS

Basic and Detail design, BIM&VDC Coordination

HOW DOES IT WORK

• Engineering works fully implemented in BIM
• Common Data Environmental (CDE) as a single data source
• Friendly atmosphere and willingness to act quickly on client feedback or requests
• Introduction of new approaches into practice of work with the client – CDE, VDC, VR.
• Flexible and transparent collaboration between project stakeholders including the training and education of all project members to deliver the project in respect of Agile principles within the challenging schedule and high technical requirements
• Good scheduling

RESULTS & ACHIEVEMENTS

• Concept design has passed the authorities review with no critical issues
• High quality and work ahead of the contract schedule
• Well-coordinated work during quarantine period
• Detail design is being developed first. Basic design as a sub-product of Detail design
• First project estimated by three points
• Detail budget control by every activity
• Basic design is formed during 3 weeks
• General contractor is involved into commenting and reviewing the design from the very beginning
• Provided formal communication and work of all project stakeholders in the CDE
• Created the code of rules for the BIM project – BIM Execution Plan (BEP), which is regularly being updated and complemented during the project progress
• Clash Detection as a quality control is being implemented on the regular base
• BIM Model direct use promotion for building site: e.g. use of geolocation points from the BIM model on the site – breakdown of axes, arrangement of piles, columns etc.
• VDC methodologies implementation based on agreed roadmap

DESCRIPTION:

Office building B04 as a part of the large office and residential complex UNIT.City

CLIENT:

Innovation park

KEY CHARACTERISTICS:

7 superstructure floors and 2 levels of underground parking
Gross area is 19.845 sq. m.
Plot area is 0.62 ha

LOCATION:

Ukraine

COMMUNICATION:

E-mail free communication based only on MS Teams (no emails anymore)
On-line meetings, desktop sharing, on-line reviews
Quick meeting notes in MS Teams (there are no routine documentation)
Document management platform (BIM360) as basis for routing reviews and cross checking

TEAM & DURATION:

16 in-house project members + 4 subcontractors
It took less than 3 month to issue the Basic design package having more than 50% of Detail design in hands

TOOLS:

Revit, Navisworks, MagiCAD, ElumTools™, SpriCAD®, BIM 360, Enscape-VR

TECHNOLOGIES:

BIM, VR, VDC, 4D (3D + time), 5D (3D + cost), Agile, Scrum, Kanban

PROCESS OPTIMIZATION:

Quickly non-bureaucratic online BIM support for design and client teams
Work with data and BIM models
Zero tolerance for paper printing. Only for submission to authorities
Agile delivery model (SCRUM) to ensure the project delivery within time schedule. No waterfall anymore
Simplicity
Visual presentation